How to build a Jira sprint report in Google Sheets™

Your manager wants the sprint in a spreadsheet: what's done, what's left, how many story points per status, maybe per person. This guide shows the JQL that finds the right issues, a free way to get them into Google Sheets, and the pivot table that turns them into a report.

Replace ABC with your project key everywhere below. (Atlassian now calls issues "work items" in parts of Jira, so you'll see both words.)

1. Start with Jira's own sprint report (free)

Before you build anything, check whether Jira already answers the question. On a scrum board, open Reports and pick:

  • Sprint report: completed and not completed work, work removed from the sprint, and work added after the sprint started (Atlassian's guide).
  • Burndown chart: how the remaining work went down during the sprint.
  • Velocity report: committed against completed points for the last sprints.

These reports are good for the sprint review. A spreadsheet is better when you need your own grouping (by person, label or epic), want to combine several projects, or need to send a file to someone who doesn't use Jira.

2. Write the sprint JQL

Build the query in Jira's issue search (switch to JQL), check the results, then copy it. These are the sprint functions you need:

ReportJQL
The sprint running nowproject = ABC AND sprint in openSprints() ORDER BY Rank
Every closed sprintproject = ABC AND sprint in closedSprints() ORDER BY created DESC
One sprint by nameproject = ABC AND sprint = "ABC Sprint 42"
One sprint by idsprint = 123
Next sprint (planning)project = ABC AND sprint in futureSprints() ORDER BY Rank
Not finished in this sprintproject = ABC AND sprint in openSprints() AND statusCategory != Done

Good to know:

  • openSprints() means active sprints, closedSprints() completed ones and futureSprints() planned ones (Atlassian's JQL functions). If several boards share the project, openSprints() can return more than one sprint.
  • Sprint names don't have to be unique. If two boards both have "Sprint 42", pick the sprint in the basic search's Sprint filter and switch to JQL: Jira writes it as sprint = 123 with the sprint's id, which is always exact.
  • An issue that was carried over belongs to several sprints. sprint = 123 still finds it, but its Sprint field lists every sprint it was in.
  • Story points live in a custom field. It's usually called "Story Points" or "Story point estimate", and its id (such as customfield_10016) differs from site to site. Check the name in the issue view.

3. Free: export the sprint to CSV and import it

  1. In Jira's issue search, run your sprint JQL.
  2. Choose the columns: at least Key, Summary, Status, Assignee, Sprint and your story points field.
  3. Open Export and pick the CSV option with your current fields.
  4. In Google Sheets, choose File > Import > Upload, pick the file, and import it into a new sheet.

That's a correct report for today. It's also a snapshot: for the next standup or the next sprint you export again. For more free options (Atlassian's own Jira Cloud for Sheets add-on and Apps Script), see how to export Jira issues to Google Sheets with JQL.

4. Build the status and story points pivot

Keep the imported data on its own tab (call it Sprint). Then:

  1. Click any cell in the data and choose Insert > Pivot table. Create it on a new sheet.
  2. Under Rows, add Status.
  3. Under Values, add your story points field and summarize by SUM. Add Key again, summarized by COUNTA, for the issue count.
  4. For a per-person view, add Assignee under Columns.

If you prefer formulas, these work on the same tab (change the column letters to match yours):

=QUERY(Sprint!A:F, "select C, sum(F), count(A) where A <> '' group by C label sum(F) 'Points', count(A) 'Issues'", 1)

Here column C is Status and F is story points. For "points done so far":

=SUMIF(Sprint!C:C, "Done", Sprint!F:F) / SUM(Sprint!F:F)

Format that cell as a percentage. The formula assumes your final status is literally called Done. Many workflows finish in another status (Closed, Released, Resolved...), or in several: use every status in the green Done category of your workflow, one SUMIF per status, added up.

5. What a spreadsheet can't tell you

An export shows each issue as it is now. It doesn't know what was in the sprint on day one, what was added later, or what the points were when the sprint started. That history is what Jira's sprint report (step 1) is for.

  • Scope change: the sprint report marks work added after the sprint started with an asterisk; or keep a copy of the day-one export (duplicate the tab and rename it with the date).
  • Carried-over work: the Sprint column lists every sprint the issue was in. To count only issues that finished in a sprint, use one JQL per sprint plus statusCategory = Done.

6. Keep it up to date on a schedule

Exporting every morning gets old fast. If the sheet should refresh by itself, and you want to know when it doesn't, that's what we built Reportwell for Jira for. It's a Google Sheets add-on, and for a sprint report it does this:

  • Runs your sprint JQL (for example sprint in openSprints()) into a tab you choose. You can also pick one of your starred Jira filters.
  • Adds custom fields by name or id in More fields, for example Sprint, Story Points or customfield_10016. If two fields have the same name, it tells you and asks for the id.
  • Writes story points as numbers and dates as real dates, so the pivot and formulas above work without cleaning. The Sprint column shows sprint names, separated by commas.
  • Refreshes every hour, day or week at the hour and time zone you pick, on our servers, so it runs while the spreadsheet is closed. A daily refresh before standup is a good fit.
  • If a scheduled refresh fails, you get a failure email, the sidebar shows why, and a log tab records the run. The old data stays in place.

Put the pivot on another tab: each refresh replaces the data tab, and the pivot updates from it. The add-on keeps no history, so the tip in step 5 (copy the tab on day one) still applies.